West County Line Road Reconstruction
Sector: Water Supply and Storage • Location: Mequon, Wisconsin, United States of America
Source: Dodge USA
DESCRIPTION OF WORK In general, the project includes pulverizing the existing pavement 5,900 SY, installation of crushed aggregate base course and widening the roadway, driveway removal and replacement, installation of a 5-inch thickness of Hot-mix asphalt 1,750 tons, shouldering, and installation of 6- foot-wide concrete sidewalk along the south side of the roadway 13,200 sf. As part of this work
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial
- Location
- Mequon, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about West County Line Road Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | DESCRIPTION OF WORK In general, the project includes pulverizing the existing pavement 5,900 SY, installation of crushed aggregate base course and widening the roadway, driveway removal and replacement, installation of a 5-inch thickness of Hot-mix asphalt 1,750 tons, shouldering, and installation of 6- foot-wide concrete sidewalk along the south side of the roadway 13,200 sf. As part of this work drainage improvements will be installed 410 LF HDPE Storm Sewer and 425 LF RCP Storm Sewer, vari... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Mequon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
