West End Building life Center Improvement
Sector: Geothermal • Location: Flatbush, New York, United States of America
Source: Dodge
Brooklyn College is drilling a 500-foot-deep geothermal test well to determine the viability of a fully integrated low-carbon energy system on campus. The project focuses on converting the West End Building to a geothermal heating and cooling system for 100% carbon-free climate control.
- Status
- Prospective
- Sector
- Geothermal, Commercial, Education, Government
- Location
- Flatbush, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about West End Building life Center Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Brooklyn College is drilling a 500-foot-deep geothermal test well to determine the viability of a fully integrated low-carbon energy system on campus. The project focuses on converting the West End Building to a geothermal heating and cooling system for 100% carbon-free climate control. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Flatbush |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Geothermal, Commercial, Education, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Geothermal projects in United States of America
- SOLAR THERMAL INSTALLATION, EVACUATED SOLAR COLLECTOR TUBES AND 950 LITER BUFFER TANK
- The Music Center at Strathmore
- National Museum of the American Indian
- Waterfront Station
- Wheaton Revitalization Project
- Polk Street Resurfacing & Sidewalk
- Thermal-Oasis Active Transportation Project
- Primary and Secondary Calibration on Active Layer (PASCAL)
