West End Sanitary Sewer Replacement
Sector: Water Supply and Storage • Location: Riverside, Pennsylvania, United States of America
Source: Dodge USA
The project is located within the Sunny Acres development of Riverside Borough, Northumberland County, Pennsylvania and generally consists of construction of approximately 4,385 L.F. of 8 inch PVC sanitary sewer in borough roadway and permanent sewer easements, 16 precast concrete manholes, 5 connections to existing manholes, approximately 54 sewer lateral stubs and cleanouts connecting to existin
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project is located within the Sunny Acres development of Riverside Borough, Northumberland County, Pennsylvania and generally consists of construction of approximately 4,385 L.F. of 8 inch PVC sanitary sewer in borough roadway and permanent sewer easements, 16 precast concrete manholes, 5 connections to existing manholes, approximately 54 sewer lateral stubs and cleanouts connecting to existing sewer laterals, decommission of approximately 63 existing sanitary septic and pump tanks, insta... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
