logo

WEST FAYETTEVILLE PATH FROM SR 54 TO CS 894/LESTER ROAD

Sector: Bridge • Location: Fayetteville, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The project will improve the pedestrian and cycling crossing facility along SR 54. The pedestrian bridge will be located approximately 941’ from of Piedmont Fayette Hospital at the intersection of Togwotee Parkway and SR 54. The bridge will be approximately 165’ long. The bridge will be elevated no less than 18’ 6” to meet minimum clearance requirement for SR 54. The shared-use trail will be 12’ w

Project Information FAQ

Project Information

3 Q
The project “WEST FAYETTEVILLE PATH FROM SR 54 TO CS 894/LESTER ROAD” is an infrastructure initiative in the Bridge sector, located in Fayetteville, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will improve the pedestrian and cycling crossing facility along SR 54. The pedestrian bridge will be located approximately 941’ from of Piedmont Fayette Hospital at the intersection of Togwotee Parkway and SR 54. The bridge will be approximately 165’ long. The bridge will be elevated no less than 18’ 6” to meet minimum clearance requirement for SR 54. The shared-use trail will be 12’ wide and will ramp up to the overpass bridge. The proposed trail location north of SR 54 will continue northbound to connect to Piedmont Fayette Hospital. On the south side of SR 54, the trail will ramp down into the existing grade and continue east along the south side of SR 54. The trail will connect to the existing shared-use trail along Lester Road.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data