logo

West Gujarat Expressway

Sector: Commercial • Location: India

Source: World Bank Group

Project
Active

West Gujarat Expressway Limited was a Special Purpose Vehicle promoted by IL&FS and group company, IL&FS Transportation Networks Limited (ITNL) for the conversion of the 68 km Jetput-Gondal-Rajkot and Rajkot Bypass section of NH-8B into an access controlled four-lane highway and improvements to Gondal-Rajkot section. This project involved the widening of the existing Jetpur–Gondal road from two la

Status
Prospective
Sector
Commercial, Road, Government, Automotive
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about West Gujarat Expressway

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “West Gujarat Expressway” is an infrastructure initiative in the Commercial sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

West Gujarat Expressway Limited was a Special Purpose Vehicle promoted by IL&FS and group company, IL&FS Transportation Networks Limited (ITNL) for the conversion of the 68 km Jetput-Gondal-Rajkot and Rajkot Bypass section of NH-8B into an access controlled four-lane highway and improvements to Gondal-Rajkot section. This project involved the widening of the existing Jetpur–Gondal road from two lanes to four lanes, the improvement of the existing four lanes between Gondal and Rajkot, the widening of the existing Rajkot bypass from two lanes to four lanes on the National Highway 8 B and construction of side roads, with an aggregate length of approximately 389 Lane kms in the State of Gujarat. The concession for this project was awarded to us by the NHAI on a BOT (Toll) basis for a period of 20 years (including a construction period of two and a half years), which commenced in September 2005 and will end in September 2025. We completed the construction of this project and commenced its commercial operations in March 2008. The Concession was awarded by NHAI on a BOT (toll) basis for a period of 20 years (including a construction period of two and a half years) in March 2005. The Concession Agreement was signed in September 2005. The Project commenced operation in March 2008. The total project cost was estimated to be INRs 2758 million (US$62.5 million). The project reached financial closure in September 2005 with a debt equity of 2.25 :1. IL&FS Investsmart Limited (IIL) was the sole arranger for the senior debt of Rs 1662 mn financed in the debt equity of 2.25:1 with Punjab National Bank as the Lead alongwith a consortium of 7 banks. The project was the first of its kind being implemented under the Viability Gap Funding Scheme of NHAI and part of the prestigious East-West corridor program of NHAI. The project received a grant of INR180 million and equity contribution of INR400 million.

Original sector

Transport

Procurement method

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Road, Government, Automotive

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project