logo

West Gujarat Expressway

Sector: Road • Location: India

Source: World Bank Group

Project
Active

West Gujarat Expressway Limited was a Special Purpose Vehicle promoted by IL&FS and group company, IL&FS Transportation Networks Limited (ITNL) for the conversion of the 68 km Jetput-Gondal-Rajkot and Rajkot Bypass section of NH-8B into an access controlled four-lane highway and improvements to Gondal-Rajkot section. This project involved the widening of the existing Jetpur–Gondal road from two la

Project Information FAQ

Project Information

5 Q
The project “West Gujarat Expressway” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

West Gujarat Expressway Limited was a Special Purpose Vehicle promoted by IL&FS and group company, IL&FS Transportation Networks Limited (ITNL) for the conversion of the 68 km Jetput-Gondal-Rajkot and Rajkot Bypass section of NH-8B into an access controlled four-lane highway and improvements to Gondal-Rajkot section. This project involved the widening of the existing Jetpur–Gondal road from two lanes to four lanes, the improvement of the existing four lanes between Gondal and Rajkot, the widening of the existing Rajkot bypass from two lanes to four lanes on the National Highway 8 B and construction of side roads, with an aggregate length of approximately 389 Lane kms in the State of Gujarat. The concession for this project was awarded to us by the NHAI on a BOT (Toll) basis for a period of 20 years (including a construction period of two and a half years), which commenced in September 2005 and will end in September 2025. We completed the construction of this project and commenced its commercial operations in March 2008. The Concession was awarded by NHAI on a BOT (toll) basis for a period of 20 years (including a construction period of two and a half years) in March 2005. The Concession Agreement was signed in September 2005. The Project commenced operation in March 2008. The total project cost was estimated to be INRs 2758 million (US$62.5 million). The project reached financial closure in September 2005 with a debt equity of 2.25 :1. IL&FS Investsmart Limited (IIL) was the sole arranger for the senior debt of Rs 1662 mn financed in the debt equity of 2.25:1 with Punjab National Bank as the Lead alongwith a consortium of 7 banks. The project was the first of its kind being implemented under the Viability Gap Funding Scheme of NHAI and part of the prestigious East-West corridor program of NHAI. The project received a grant of INR180 million and equity contribution of INR400 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data