West Industrial Boulevard Drainage Improvements
Sector: Water Supply and Storage • Location: Cleburne, Texas, United States of America
Source: Dodge USA
The major work to be performed under this project includes the demolition of 236 LF of existing storm pipe as well as 6,300 SY of asphalt pavement and road base under West Industrial Boulevard. New construction of approximately 1,200 LF of storm sewer, 8,150 SY of asphalt pavement and road base, along with 2,861 LF of twelve inch (12 ) sanitary sewer installation.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Manufacturing (Industrial), Government, Commercial, Raw Materials
- Location
- Cleburne, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about West Industrial Boulevard Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The major work to be performed under this project includes the demolition of 236 LF of existing storm pipe as well as 6,300 SY of asphalt pavement and road base under West Industrial Boulevard. New construction of approximately 1,200 LF of storm sewer, 8,150 SY of asphalt pavement and road base, along with 2,861 LF of twelve inch (12 ) sanitary sewer installation. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Cleburne |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Manufacturing (Industrial), Government, Commercial, Raw Materials |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
