logo

West Kings High School Sidewalk

Sector: Commercial • Location: Auburn, Nova Scotia, Canada

Source: Dodge USA

Project
Closed

23-33 West Kings High School Sidewalk. Earthwork 1. Clearing L.S. 1 3. Mass Excavation - Common L.S. 1 8. Fill L.S. 1 9. Exploratory Excavation ea 3 Storm Sewer 31.a 250mm PVC DR35 m 60 31.b 300mm PVC DR35 m 6 31.c 375mm PVC DR35 m 6 31.d 450mm Conc. CSA A257.2 m 25 31.e 525mm Conc. CSA A257.2 m 40 33. Catch Basins ea 5 36. Connections to Existing Main ea 1 38. Closed Circuit Television Inspection

Status
Closed
Sector
Commercial, Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Mass Transit, Government, Automotive, Rail
Location
Auburn, Nova Scotia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about West Kings High School Sidewalk

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “West Kings High School Sidewalk” is an infrastructure initiative in the Commercial sector, located in Auburn, Nova Scotia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

23-33 West Kings High School Sidewalk. Earthwork 1. Clearing L.S. 1 3. Mass Excavation - Common L.S. 1 8. Fill L.S. 1 9. Exploratory Excavation ea 3 Storm Sewer 31.a 250mm PVC DR35 m 60 31.b 300mm PVC DR35 m 6 31.c 375mm PVC DR35 m 6 31.d 450mm Conc. CSA A257.2 m 25 31.e 525mm Conc. CSA A257.2 m 40 33. Catch Basins ea 5 36. Connections to Existing Main ea 1 38. Closed Circuit Television Inspection L.S. 1 39. Headwall (450-750) ea 8 40. Catch Basin Relocation ea 1 Street Construction 41. Grave...

Procurement method

Budget

Location

Country

Canada

State

Nova Scotia

City

Auburn

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Mass Transit, Government, Automotive, Rail

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project