logo

West Lake Drive over Lucille River Bridge Replacement

Sector: Government • Location: Fort Lauderdale, Florida, United States of America

Source: Dodge

Project
Pre-Design

This project is for the replacement of the West Lake Drive Bridge (#865773), spanning over the Lucille River. The main bridge is primarily reinforced concrete. The bridge is approximately 184-feet long by 30- feet wide, with a narrow 3-foot sidewalk on one side. The two-lane bridge serves as the only access to the island and is a designated school bus route. The City of Fort Lauderdale may be seek

Status
Prospective
Sector
Government, Cement, Commercial, Bridge, Road, Car parking, Automotive
Location
Fort Lauderdale, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about West Lake Drive over Lucille River Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “West Lake Drive over Lucille River Bridge Replacement” is an infrastructure initiative in the Government sector, located in Fort Lauderdale, Florida, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project is for the replacement of the West Lake Drive Bridge (#865773), spanning over the Lucille River. The main bridge is primarily reinforced concrete. The bridge is approximately 184-feet long by 30- feet wide, with a narrow 3-foot sidewalk on one side. The two-lane bridge serves as the only access to the island and is a designated school bus route. The City of Fort Lauderdale may be seeking a consultant to provide Design for West Lake Drive Bridge over Lucille River Replace.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Fort Lauderdale

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Cement, Commercial, Bridge, Road, Car parking, Automotive

Article published date

2025-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project