West lake sammamish parkway phase 2
One of 10,000+ projects Taiyo tracks in Washington.
Source: City of Bellevue
West Lake Sammamish Parkway Phase 2 | City of Bellevue Skip to main content Bellevue home Bellevue Home City Government Boards, Commissions and Committees City Code, Resolutions and Ordinances City Council Communications Departments East Bellevue Community Council Hot Topics and Initiatives Public Records Requests Sister Cities Departments City Attorney's Office City Clerk's Office City Manager's
- Status
- Closed
- Sector
- Car parking, Commercial, Government, Water Supply and Storage, Power Transmission, Residential, Road, Automotive, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Bellevue, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- City of Bellevue
ConstructChat
Ask ConstructChat about West lake sammamish parkway phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | West Lake Sammamish Parkway Phase 2 | City of Bellevue Skip to main content Bellevue home Bellevue Home City Government Boards, Commissions and Committees City Code, Resolutions and Ordinances City Council Communications Departments East Bellevue Community Council Hot Topics and Initiatives Public Records Requests Sister Cities Departments City Attorney's Office City Clerk's Office City Manager's Office Communications Community Development Development Services Emergency Management Finance & Asset Management Fire Human Resources Information Technology Parks & Community Services Police Transportation Utilities Discover Bellevue About Us Bellevue Television City News Things to Do Arts in Bellevue Parks and Trails Economic Development Doing Business Building and Zoning Doing Business in Bellevue Doing Business with Bellevue Public Safety Police Fire Emergencies and Extreme Weather Emergency Preparedness Municipal Court Neighborhood Traffic Safety Probation Public Defenders Resident Resources Customer Assistance Conflict Assistance Diversity Advantage Languages Neighborhoods Newcomers Guide Permits, Parking and Utilities Volunteering Local Service Agencies City of Bellevue, WA Transportation Go! Language English Español 简体中文 繁體中文 日本語 한국어 Pусский Tiếng Việt Menu Breadcrumb Home City Government Departments Transportation Projects Capital Projects West Lake Sammamish Parkway Phase 2 West Lake Sammamish Parkway Phase 2 MyBellevue Chatbot MyBellevue Chatbot × Give Feedback Copied to clipboard Capital Projects Eastrail Multi-use Corridor Eastrail to NE 12th Street Trail Connection Mountains to Sound Greenway Trail West Lake Sammamish Parkway Phase 2 148th Avenue SE at Larsen Lake Flood Mitigation 150th Avenue SE Mobility Project Bellevue College Connection Bellevue Grand Connection: I-405 Crossing – Downtown to Eastrail Bellevue Transit Center Raised Intersections Header Image The West Lake Sammamish Parkway SE, Phase 2, project is the second of five anticipated segments of the Parkway slated for improvements (from Interstate 90 to the Redmond border, south of NE 24th Street). Phase 2 work will extend from approximately the Northeast 200 block to the Northeast 800 block ( project map ). The project will be done in coordination with Bellevue Utilities' West Lake Sammamish Parkway Water Pressure Project . Construction impacts Construction began in April 2020 and is expected to be completed in 2022. The multipurpose path on the west side of the Parkway, north of Northup Way, opened for use in June 2021. The second phase of construction stretches from Southeast First Street to the 1900 block. Benefits Transportation improvements include new pavement, an 8-10-foot wide multipurpose path on the west side, a landscaped buffer, two 10-foot wide travel lanes and a four-foot shoulder on the east side. In addition to Utilities' work to replace water mains, other improvements will feature new lighting, landscaping, irrigation and storm drainage. Schedule 2022: All work completed 2020: Construction starts 2018: Design work and public outreach Funding The budget for transportation improvements only is $8 million. Outreach materials Detour update project mailer (June 2021) Project update letter to properties along West Lake Sammamish (December 2020) Construction alert (April 2020) Project map (February 2018) Proposed roadway cross section (April 2018) Project mailer (April 2018) Commission presentation (April 2018) Contact Paul Krawczyk Telephone 425-452-7905 Email pkrawczyk@bellevuewa.gov Social Media City of Bellevue, WA 450 110th Avenue NE Bellevue, WA 98004 Directions to City Hall Monday-Friday 8 a.m.-4 p.m. Footer Menu Contacts 425-452-6800 servicefirst@bellevuewa.gov MyBellevue Customer Assistance Contact Us / Employee Directory Careers ADA/Title VI Notices Languages English Español 简体中文 繁體中文 日本語 한국어 Pусский Tiếng Việt Request a Translation Request a Translation اطلب ترجمة 申请翻译 要求翻譯 अनुवाद का अनुरोध करें 翻訳をリクエストする 번역 요청 درخواست ترجمه ਅਨੁਵਾਦ ਦੀ ਬੇਨਤੀ ਕਰੋ Запрос на перевод Solicitud de traducción అనువాదం అడగండి ترجمےکے لئے ایک درخواست Yêu cầu bản dịch ትርጉም መጠየቅ Social Media © 2019 City of Bellevue | All Rights Reserved. | ADA/Title VI Notices | Terms of Use | Privacy Policy | Site Map |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Bellevue |
Source
Source reliability | High |
Source | City of Bellevue |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Government, Water Supply and Storage, Power Transmission, Residential, Road, Automotive, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2023-10-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
