logo
ProjectClosed

West Main St Retaining Wall Construction

Closed · Tennessee · Last reported Aug 2025

Source: Dodge

: This section includes a concrete poured in place wall that is a minimum of 6 inches thick. The wall is 485 feet in length and tapers down from a high point of 33 inches to a 6-inch curb. There shall be a 12-inch x 12-inch concrete footer installed with rebar extending from the footer for the concrete wall pour. The concrete wall is to be poured in front of the existing wall and shall be anchored

Status
Closed
Sector
Cement, Government, Car parking, Steel, Automotive, Commercial
Location
Jonesborough, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about West Main St Retaining Wall Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “West Main St Retaining Wall Construction” is an infrastructure initiative in the Cement sector, located in Jonesborough, Tennessee, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

: This section includes a concrete poured in place wall that is a minimum of 6 inches thick. The wall is 485 feet in length and tapers down from a high point of 33 inches to a 6-inch curb. There shall be a 12-inch x 12-inch concrete footer installed with rebar extending from the footer for the concrete wall pour. The concrete wall is to be poured in front of the existing wall and shall be anchored in place to existing wall where possible. There shall be #4 rebar horizontally at 8 inches on ce...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Jonesborough

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Government, Car parking, Steel, Automotive, Commercial

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project