West Main Street Bridge Replacement
Sector: Steel • Location: Frankfort, New York, United States of America
Source: Dodge USA
The project includes removing and replacing the existing bridge carrying West Main Street over Moyer Creek. The new structure will consist of a multiple adjacent prestressed concrete box beam superstructure with concrete deck. The substructure will consist of integral abutments supported on drilled micropiles. The existing concrete encased steel girders and substructure will be completely removed
- Status
- Closed
- Sector
- Steel, Bridge, Road, Waste Processing and Treatment, Water Supply and Storage, Cement, Government, Metal, Commercial
- Location
- Frankfort, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about West Main Street Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results, Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes removing and replacing the existing bridge carrying West Main Street over Moyer Creek. The new structure will consist of a multiple adjacent prestressed concrete box beam superstructure with concrete deck. The substructure will consist of integral abutments supported on drilled micropiles. The existing concrete encased steel girders and substructure will be completely removed over two stages, while maintaining traffic on site during construction. The project includes appr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Frankfort |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Bridge, Road, Waste Processing and Treatment, Water Supply and Storage, Cement, Government, Metal, Commercial |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
