logo

West Napa Street Water System Replacement

Sector: Car parking • Location: CA, United States of America (USA)

Source: Anvil Builders

Project

The West Napa Street Water System Replacement project is part of the City of Sonoma’s efforts to replace aging and/or failing water system infrastructure ahead of a Caltrans paving project. These improvements are expected to enhance water conservation by reducing groundwater leaks, upgrade fire safety by adding more hydrants to the system, and reduce the risk of unplanned outages. Anvil Builders w

Project Information FAQ

Project Information

3 Q
The project “West Napa Street Water System Replacement” is an infrastructure initiative in the Car parking sector, located in CA, United States of America (USA). Taiyo aggregates data on it from Anvil Builders.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The West Napa Street Water System Replacement project is part of the City of Sonoma’s efforts to replace aging and/or failing water system infrastructure ahead of a Caltrans paving project. These improvements are expected to enhance water conservation by reducing groundwater leaks, upgrade fire safety by adding more hydrants to the system, and reduce the risk of unplanned outages. Anvil Builders was contracted for the installation of 2,600 ft of new 8” water main, along with 65 new service laterals; the replacement of 6 existing fire hydrants, and the installation of 6 new hydrants; and repairs to sidewalk, driveways, curb and gutters damaged during construction activities. Anvil also repaved a five-foot wide path down the entire half-mile construction zone in West Napa Street after the 5 ft wide utility trench was filled in. Challenges overcome by Anvil’s management team included having to perform all work in the street during nighttime hours, having demolition activities further restricted to just a 2-hour window each night, and contending with plant opening fees for concrete and asphalt deliveries. And because West Napa Street is a State highway, lengthy and complicated permitting through Caltrans’ system was required.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data