logo

West of Devers Upgrade (CACA-55285)

Sector: Power Generation (CCGT) • Location: CA, United States of America

Source: US Department of Transportation (USDOT)

Project
Close

Other Agencies with Actions or Authorizations: Department of the Interior Description: The West of Devers Upgrade Project as proposed by SCE includes the following major components: Removal and upgrade of existing 220 kV transmission lines. Upgrades would occur on 30 miles of the Devers–El Casco line, 14 miles of the El Casco–San Bernardino line, 43 miles of the Devers–San Bernardino line, 45 mile

Project Information FAQ

Project Information

4 Q
The project “West of Devers Upgrade (CACA-55285)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in CA, United States of America. Taiyo aggregates data on it from US Department of Transportation (USDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Other Agencies with Actions or Authorizations: Department of the Interior Description: The West of Devers Upgrade Project as proposed by SCE includes the following major components: Removal and upgrade of existing 220 kV transmission lines. Upgrades would occur on 30 miles of the Devers–El Casco line, 14 miles of the El Casco–San Bernardino line, 43 miles of the Devers–San Bernardino line, 45 miles of the Devers-Vista No. 1 and No. 2 lines, 3.5 miles of the Etiwanda–San Bernardino line, and 3.5 miles of the San Bernardino-Vista line.   Upgrade substation equipment at Devers, El Casco, Etiwanda, San Bernardino, and Vista Substations to accommodate increased power transfer on 220 kV lines.   Upgrade Timoteo and Tennessee 66/12 kV substations to accommodate 66 kV subtransmission line relocations.   Removal and relocation of 2 miles of two existing 66 kV subtransmission lines.   Removal and relocation of 4 miles of existing 12 kV distribution lines.   Installation of telecommunication lines and equipment for the protection, monitoring, and control of transmission lines and substation equipment. The Proposed Project would be located within the existing West of Devers right-of way corridor in incorporated and unincorporated areas of Riverside and San Bernardino Counties. The ROW passes through the reservation trust land of the Morongo Band of Mission Indians and the cities of Banning, Beaumont, Calimesa, Colton, Grand Terrace, Loma Linda, Palm Springs, Rancho Cucamonga, Redlands, San Bernardino, and Yucaipa.  SCE states that the Proposed Project would be operational by 2020.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data