West Orange Trail Extension Phase 4B
Sector: Consumer Products • Location: Winter Garden, Florida, United States of America
Source: Dodge
Final Engineering Design Services For The West Orange Trail - Phase 4B. The design will include various trail safety measures including signals, signage, crosswalks, lighting and pavement striping. The design will include various trail amenities such as benches, trash receptables and landscaping. Final Engineering Design Services For The West Orange Trail - Phase 4B. The design will include variou
- Status
- Closed
- Sector
- Consumer Products, Government, Mass Transit, Road, Commercial, Rail, Car parking, Automotive
- Location
- Winter Garden, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about West Orange Trail Extension Phase 4B
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Final Engineering Design Services For The West Orange Trail - Phase 4B. The design will include various trail safety measures including signals, signage, crosswalks, lighting and pavement striping. The design will include various trail amenities such as benches, trash receptables and landscaping. Final Engineering Design Services For The West Orange Trail - Phase 4B. The design will include various trail safety measures including signals, signage, crosswalks, lighting and pavement striping. T... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Winter Garden |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Government, Mass Transit, Road, Commercial, Rail, Car parking, Automotive |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- CS 611/SURSSON STREET FROM SR 4 TO OLD BEN CARTER ROAD - TIA
- EAST TOLLISION STREET
- NORMAN BERRY DR/BOBBY BROWN FROM SUMNER PARK TO VIRGINIA AVE
- NEW DETACHED ADU, 840 SQ.FT. AND NEW PORCH, 32 SQ.FT.
- NEW DETACHED ADU 799 SQ. FT. - 3 BED 2 BATH
- BLDG 3, UNIT 4, NEW TOWNHOME WITH GARAGE 1605 SQ FT LIVING, 482 SQ FT GARAGE
- The Kia Forum
- William R. Boone High School
