logo
ProjectClosed

West Outer Water Main Replacement Phase III

One of 10,000+ projects Taiyo tracks in Tennessee.

Source: Dodge USA

The work in general consists of construction of the following: 1. Water Main Improvements: A. Approximately 1,040 linear feet of 16-inch diameter DIP water line. B. 271 linear feet of HDPE water main by Horizontal Directional Drill C. 4 new main line valve assemblies. D. 14 new service connections. E. 2 new fire hydrant and valve assemblies. F. Other appurtenances required for a complete, function

Status
Closed
Sector
Commercial, Water Supply and Storage, Road, Government
Location
Oak Ridge, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about West Outer Water Main Replacement Phase III

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “West Outer Water Main Replacement Phase III” is an infrastructure initiative in the Commercial sector, located in Oak Ridge, Tennessee, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work in general consists of construction of the following: 1. Water Main Improvements: A. Approximately 1,040 linear feet of 16-inch diameter DIP water line. B. 271 linear feet of HDPE water main by Horizontal Directional Drill C. 4 new main line valve assemblies. D. 14 new service connections. E. 2 new fire hydrant and valve assemblies. F. Other appurtenances required for a complete, functional system. G. Removal of existing fire hydrants and valve boxes as required. 2. Roadway Improveme...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Oak Ridge

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Road, Government

Article published date

2024-08-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project