West Pump Station
Sector: Water Supply and Storage • Location: Dell Rapids, South Dakota, United States of America
Source: Dodge USA
Construction of a 2,400 square foot pump station building utilizing precast concrete wall panels, double tee roof structure, and membrane roofing system. Pump station will include all pumps, piping, fittings, flow meters, transmitters, gauges, combination air valves, pressure relief valves, check valves, and telemetry & control system to provide a complete and functioning pump station; two (2) hor
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Power Transmission
- Location
- Dell Rapids, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about West Pump Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a 2,400 square foot pump station building utilizing precast concrete wall panels, double tee roof structure, and membrane roofing system. Pump station will include all pumps, piping, fittings, flow meters, transmitters, gauges, combination air valves, pressure relief valves, check valves, and telemetry & control system to provide a complete and functioning pump station; two (2) horizontal split case pumps; two (2) vertical multistage pumps; all electrical and mechanical system... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Dell Rapids |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Power Transmission |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
