logo

West sammamish river bridge replacement

Sector: Bridge • Location: Kenmore, Washington, United States of America

Source: Kenmore Washington

Project
Closed

There are channelization changes coming to the 68th Ave corridor between 175th St and 181st St. The pavement markings south of 175th St were completed with the bridge project, but the changes north of 175th St were delayed, resulting in the mismatch with the double-right arrow in the northbound curb lane. Although this mismatch has raised some eyebrows, it does not present a safety hazard to drive

Project Information FAQ

Project Information

5 Q
The project “West sammamish river bridge replacement” is an infrastructure initiative in the Bridge sector, located in Kenmore, Washington, United States of America. Taiyo aggregates data on it from Kenmore Washington.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

There are channelization changes coming to the 68th Ave corridor between 175th St and 181st St. The pavement markings south of 175th St were completed with the bridge project, but the changes north of 175th St were delayed, resulting in the mismatch with the double-right arrow in the northbound curb lane. Although this mismatch has raised some eyebrows, it does not present a safety hazard to drivers. When the re channelization on work on 68th Ave is completed in the late spring/early summer, all the signs and marking will agree and the issue will resolve itself. The project replaced the existing west bridge (southbound travel lanes) across the Sammamish River and included the construction of new sidewalk and bike facilities on the west side of the road between NE 170th St and NE 175th St. The project also replaced the signals on 68th at 170th and 175th, replaced existing and added new streetlights, moved utilities to underground conduit, and added new landscaping. In addition, the project made improvements to the approaches to the bridge between NE 170th St and NE 175th St.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data