West sammamish river bridge replacement
Sector: Bridge • Location: Kenmore, Washington, United States of America
Source: Kenmore Washington
There are channelization changes coming to the 68th Ave corridor between 175th St and 181st St. The pavement markings south of 175th St were completed with the bridge project, but the changes north of 175th St were delayed, resulting in the mismatch with the double-right arrow in the northbound curb lane. Although this mismatch has raised some eyebrows, it does not present a safety hazard to drive
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | There are channelization changes coming to the 68th Ave corridor between 175th St and 181st St. The pavement markings south of 175th St were completed with the bridge project, but the changes north of 175th St were delayed, resulting in the mismatch with the double-right arrow in the northbound curb lane. Although this mismatch has raised some eyebrows, it does not present a safety hazard to drivers. When the re channelization on work on 68th Ave is completed in the late spring/early summer, all the signs and marking will agree and the issue will resolve itself. The project replaced the existing west bridge (southbound travel lanes) across the Sammamish River and included the construction of new sidewalk and bike facilities on the west side of the road between NE 170th St and NE 175th St. The project also replaced the signals on 68th at 170th and 175th, replaced existing and added new streetlights, moved utilities to underground conduit, and added new landscaping. In addition, the project made improvements to the approaches to the bridge between NE 170th St and NE 175th St. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
