West Town Elementary Medical Office
Sector: Power Generation (CCGT) • Location: Albany, Georgia, United States of America
Source: Dodge USA
The scope of work includes all labor, material, and equipment required to provide the West Town Elementary Medical Office as specified in the bid documents. The work will include mechanical, electrical, plumbing, selective demolition, concrete, millwork, light gage metal framing/drywall, hollow metal door frames, doors/hardware, toilet accessories, acoustical ceiling, floor tile, and painting at W
- Status
- Closed
- Sector
- Power Generation (CCGT), Residential, Commercial, Education, Cement, Metal, Government, Hospital, Hotel
- Location
- Albany, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about West Town Elementary Medical Office
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work includes all labor, material, and equipment required to provide the West Town Elementary Medical Office as specified in the bid documents. The work will include mechanical, electrical, plumbing, selective demolition, concrete, millwork, light gage metal framing/drywall, hollow metal door frames, doors/hardware, toilet accessories, acoustical ceiling, floor tile, and painting at West Town Elementary Medical Office; 1113 University Avenue, Albany Ga. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Albany |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Residential, Commercial, Education, Cement, Metal, Government, Hospital, Hotel |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
