logo

West Virginia Integrated Resource Plan and Transmission Expansion

Sector: Solar • Location: West Virginia, United States

Source: The Motley Fool

Project
Planned

FirstEnergy submitted an integrated resource plan in West Virginia proposing 70 MW utility-scale solar by 2028, 1.2 GW dispatchable gas combined cycle generation by 2031, and continued operation of existing coal plants. The company plans significant incremental investments in transmission infrastructure to support growing demand, including reliability enhancements, regulatory required investments,

Status
Prospective
Sector
Solar, Power Generation (CCGT), Power Transmission
Location
West Virginia, United States of America
Updated
22 Jul 2026
Source
The Motley Fool

ConstructChat

Ask ConstructChat about West Virginia Integrated Resource Plan and Transmission Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “West Virginia Integrated Resource Plan and Transmission Expansion” is an infrastructure initiative in the Solar sector, located in West Virginia, United States. Taiyo aggregates data on it from The Motley Fool.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

FirstEnergy submitted an integrated resource plan in West Virginia proposing 70 MW utility-scale solar by 2028, 1.2 GW dispatchable gas combined cycle generation by 2031, and continued operation of existing coal plants. The company plans significant incremental investments in transmission infrastructure to support growing demand, including reliability enhancements, regulatory required investments, and regional network upgrades through PJM's RTEP open window process. Transmission investments for 2026-2030 are expected to increase by 30% compared to the current five-year plan, with a compound transmission rate base growth of up to 18% annually through 2030. The 1.2 GW gas generation project is estimated at $2.5 billion, pending regulatory approval.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

West Virginia

Source

Source

The Motley Fool

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Power Transmission

Article published date

2026-05-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project