West Water Treatment Plant Operator Control Console Upgrades
Sector: Water Supply and Storage • Location: Deerfield Beach, Florida, United States of America
Source: Dodge USA
The City of Deerfield Beach is soliciting sealed responses from qualified vendors for the Operator Control Console Replacement for Water Plant Operations in accordance with the terms, conditions, scope of work, drawings and technical specifications of the above-mentioned Invitation to Bid Construction.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Deerfield Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about West Water Treatment Plant Operator Control Console Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Deerfield Beach is soliciting sealed responses from qualified vendors for the Operator Control Console Replacement for Water Plant Operations in accordance with the terms, conditions, scope of work, drawings and technical specifications of the above-mentioned Invitation to Bid Construction. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Deerfield Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
