West Whittier - Summerfield Av Et. Al.
One of 10,000+ projects Taiyo tracks in California.
Source: LA County Department of Public Work (DPW)
The proposed work includes micro-milling to improve road ride-ability; scrub seal to seal cracks; and slurry seal to preserve the pavement and provide a smoother, more finished driving surface. The preservation is estimated to extend the pavement life for an additional 6 to 8 years. To better care for the environment, all aggregates (tiny rocks) used come from recycled pavement. Needed sidewalk, c
- Status
- Under Construction
- Sector
- Car parking, Road, Government, Residential, Automotive
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- LA County Department of Public Work (DPW)
ConstructChat
Ask ConstructChat about West Whittier - Summerfield Av Et. Al.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | development |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed work includes micro-milling to improve road ride-ability; scrub seal to seal cracks; and slurry seal to preserve the pavement and provide a smoother, more finished driving surface. The preservation is estimated to extend the pavement life for an additional 6 to 8 years. To better care for the environment, all aggregates (tiny rocks) used come from recycled pavement. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source | LA County Department of Public Work (DPW) |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Residential, Automotive |
Article published date | 2024-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
