West Winterberry Dr. Bridge Replacement
Sector: Water Supply and Storage • Location: Marco Island, Florida, United States of America
Source: Dodge USA
The Scope of Work includes plans and specifications for the removal and disposal of the superstructure and substructure of the existing multispan concrete bridge, design of a single span replacement bridge, removal and replacement of City owned utility lines currently attached to the existing structure, design of new seawalls under and adjacent to the existing structure, design of retaining wall s
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Cement, Power Transmission, Waste Processing and Treatment, Car parking, Road, Automotive, Government, Commercial, Power Generation (CCGT)
- Location
- Marco Island, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about West Winterberry Dr. Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Scope of Work includes plans and specifications for the removal and disposal of the superstructure and substructure of the existing multispan concrete bridge, design of a single span replacement bridge, removal and replacement of City owned utility lines currently attached to the existing structure, design of new seawalls under and adjacent to the existing structure, design of retaining wall systems to raise the roadway approaches, design of storm drain systems in accordance with current ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Marco Island |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Cement, Power Transmission, Waste Processing and Treatment, Car parking, Road, Automotive, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
