West WTP Ground Storage Reservoir
Sector: Raw Materials • Location: Fullerton, North Dakota, United States of America
Source: Dodge USA
Description: The Work is comprised of one (1) Contract: Contract No. 1 General Construction The Work for this Contract is generally described as follows: Contract No. 1 General Construction (Lump Sum): Mobilization, bonding, and insurance for all Project work shown on the Drawings; site work; furnishing and installing a concrete valve vault and a new 500,000 Gallon Glass-Fused-to-Steel-Bolted or P
- Status
- Closed
- Sector
- Raw Materials, Steel, Cement, Consumer Products, Government, Cable car, Telecommunications, Water Supply and Storage, Metal, Automotive, Commercial
- Location
- Fullerton, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about West WTP Ground Storage Reservoir
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Description: The Work is comprised of one (1) Contract: Contract No. 1 General Construction The Work for this Contract is generally described as follows: Contract No. 1 General Construction (Lump Sum): Mobilization, bonding, and insurance for all Project work shown on the Drawings; site work; furnishing and installing a concrete valve vault and a new 500,000 Gallon Glass-Fused-to-Steel-Bolted or Prestressed Concrete Ground Storage Reservoir; and all on-site excavation, borrow, fill, and aggre... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Fullerton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Steel, Cement, Consumer Products, Government, Cable car, Telecommunications, Water Supply and Storage, Metal, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
