logo

WestAir and Nikkiso Multi-Function Hydrogen Refueling Station

Sector: LNG • Location: Long Beach, California, United States

Source: Fuel Cells Works

Project
Under Construction

Nikkiso Clean Energy & Industrial Gases Group (Nikkiso CE&IG) and WestAir are building a hybrid hydrogen trailer and fueling station in Long Beach, California, designed to reduce boil-off gas losses close to zero. The station will provide hydrogen dispensing at 350 bar (H35) for transit buses, with future expansion to 700 bar (H70). It includes LH2 storage with advanced insulation, multiple fuelin

Project Information FAQ

Project Information

3 Q
The project “WestAir and Nikkiso Multi-Function Hydrogen Refueling Station” is an infrastructure initiative in the LNG sector, located in Long Beach, California, United States. Taiyo aggregates data on it from Fuel Cells Works.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Nikkiso Clean Energy & Industrial Gases Group (Nikkiso CE&IG) and WestAir are building a hybrid hydrogen trailer and fueling station in Long Beach, California, designed to reduce boil-off gas losses close to zero. The station will provide hydrogen dispensing at 350 bar (H35) for transit buses, with future expansion to 700 bar (H70). It includes LH2 storage with advanced insulation, multiple fueling capabilities including transit bus filling and tube trailer filling, redundant cryogenic pumps, dual loading bays, advanced automation, and a flow rate up to 120 kg/hour at 500 bar. Fabrication will be done by Nikkiso CE&IG specialists in Southern California, with commissioning starting in Q4 2025 and full operation expected by Q1 2026.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data