Westbound Green River Tunnel Reopening
Sector: Tunnel • Location: Green River, Wyoming, United States
Source: Cowboy State Daily
The westbound Green River Tunnel on Interstate 80 outside of Green River, Wyoming, reopened to traffic after being closed for over eight months due to damage from a fiery and fatal 26-vehicle crash. The reopening marks the restoration of this critical transportation infrastructure.
- Status
- Closed
- Sector
- Tunnel, Road
- Location
- Green River, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Cowboy State Daily
ConstructChat
Ask ConstructChat about Westbound Green River Tunnel Reopening
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The westbound Green River Tunnel on Interstate 80 outside of Green River, Wyoming, reopened to traffic after being closed for over eight months due to damage from a fiery and fatal 26-vehicle crash. The reopening marks the restoration of this critical transportation infrastructure. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Green River |
Source
Source | Cowboy State Daily |
URL |
More Details
Record type | Project |
Sector | Tunnel, Road |
Article published date | 2025-11-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
