Western Area Power Generation Project
Sector: Power Generation (CCGT) • Location: Sierra Leone
Source: World Bank Group
The project entails the construction, operation and financing of a power plant, located in the Kissy Dock area, approximately 4 km east of the centre of Freetown, Sierra Leone. The capacity of the facility is 57 MW. The project will be developed, overseen and operated by Globeleq, Africa’s independent power company. The venture will be developed and financed by CDC and TCQ Power. The total cost of
- Status
- Prospective
- Sector
- Power Generation (CCGT), Power Transmission, Government, Commercial
- Location
- Sierra Leone
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Western Area Power Generation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the construction, operation and financing of a power plant, located in the Kissy Dock area, approximately 4 km east of the centre of Freetown, Sierra Leone. The capacity of the facility is 57 MW. The project will be developed, overseen and operated by Globeleq, Africa’s independent power company. The venture will be developed and financed by CDC and TCQ Power. The total cost of the initiative is being estimated at $40 million. The project will be financed from World Bank Group support provided by the Multilateral Investment Guarantee Agency (MIGA), the World Bank’s International Development Agency (IDA) and the International Finance Corporation (IFC). The appointed engineering, procurement and construction contractor, Wärtsilä, will design and build the plant, and once completed will provide full operations and maintenance services to the plant for 15 years. The generated electricity will be sold under a 20-year power purchase agreement with EDSA, the Sierra Leone state owned utility, and the Government of Sierra Leone. Construction start was put on March 7, 2018. https://www.petroleumafrica.com/power-plant-breaks-ground-in-sierra-leone/ http://projects.worldbank.org/P153805/?lang=en&tab=financial https://www.esi-africa.com/western-area-power-generation-project-commences-construction/ |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Sierra Leone |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Government, Commercial |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project