Western Balkans Private Sector Support Facility (PSSF)
Complete · Regional
Source: European Bank for Reconstruction and Development (EBRD)
Sub-projects signed under this framework The EBRD is considering a framework operation of EUR 110 million under which credit lines will be provided by EBRD to commercial banks in the Western Balkan region for on-lending to (i) private sector borrowers for energy efficiency and small-scale renewable energy investments and (ii) SMEs to improve competitiveness in preparation for EU accession. The Pro
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Residential
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Western Balkans Private Sector Support Facility (PSSF)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sub-projects signed under this framework The EBRD is considering a framework operation of EUR 110 million under which credit lines will be provided by EBRD to commercial banks in the Western Balkan region for on-lending to (i) private sector borrowers for energy efficiency and small-scale renewable energy investments and (ii) SMEs to improve competitiveness in preparation for EU accession. The Project will Clients of the facility will be commercial banks operating in the Western Balkans region. It is planned that clients will be selected from leading commercial banks with extensive outreach into the industrial and SME segment and the institutional capacity and commitment to successfully implement the Project. EUR 110 million in senior loans. EUR 110 million. Categorised FI (2008): This project offers significant environmental opportunities as it will contribute to the reduction of greenhouse gases and the improvement of environmental and health and safety standards. All participating banks are required to comply with the requirements of EBRD’s Performance Requirement 2 (“PR”) on Labour and Working Conditions. All sub-loans under the credit lines will need to comply with the requirements of PR9. Sub-borrowers financed through the credit lines will be required to comply with national requirements for environment, health and safety and labour standards. Reporting on sub-projects and annual environmental and social reports will be provided by the participating banks. An independent consultant will be employed to review proposals and confirm compliance with national EHSL requirements. The Facility will be supported by a comprehensive technical assistance programme to provide implementation support to participating banks and sub-borrowers, as well as financial incentives for participating banks and sub-borrowers to overcome the barriers to implementing the desired investments. Funding for the TC and incentive programme is provided under the EC IPA 2009 funding allocation. Teresa Godwin-Coombs E-mail: godwint@ebrd.com |
Original sector | Financial Institutions |
Location
Country | United States of America (USA) |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
