Western Balkans Trade and Transport Facilitation 2.0 Phase II (Albania)
Pipeline · Albania
Source: World Bank Group
The project is structured into three components that are consistent across the region and phases of the MPA, with the scope of activities tailored to each country: (i) improving border and corridor efficiency, (ii) increasing market competitiveness, and (iii) project management and implementation to enhance technical and institutional capacity for trade and transport. The components reflect the ra
- Status
- Prospective
- Sector
- Road, Seaport
- Location
- Albania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Western Balkans Trade and Transport Facilitation 2.0 Phase II (Albania)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pipeline |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is structured into three components that are consistent across the region and phases of the MPA, with the scope of activities tailored to each country: (i) improving border and corridor efficiency, (ii) increasing market competitiveness, and (iii) project management and implementation to enhance technical and institutional capacity for trade and transport. The components reflect the rationale and challenges faced by the traders at the border, e.g., subpar infrastructure and clearance processes, and away from the border, e.g., norms and standards typically enforced inland through market surveillance and connectivity efficiency and safety in road, and maritime transport. The MPA is anchored in enhancing the efficiency of the core and comprehensive transport networks in the WB6 to improve physical connectivity to the TEN-T corridors, while simultaneously strengthening trade facilitation to foster smoother regional integration with EU markets. |
Budget |
Location
Country | Albania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Seaport |
Article published date | 2026-03-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
