Western District Library 2025 Facility Improvement
Sector: Commercial • Location: Orion, Illinois, United States of America
Source: Dodge
Installation of a new perimeter drainage and sump pump system in the basement. Also, includes renovating existing room in the basement with new flooring, paint, HVAC, lighting, and windows. Other renovations are noted on the documents.
- Status
- Prospective
- Sector
- Commercial, Manufacturing (Industrial), Education, Government, Waste Processing and Treatment
- Location
- Orion, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Western District Library 2025 Facility Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of a new perimeter drainage and sump pump system in the basement. Also, includes renovating existing room in the basement with new flooring, paint, HVAC, lighting, and windows. Other renovations are noted on the documents. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Orion |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Education, Government, Waste Processing and Treatment |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
