Western Interceptor Sewer CCTV and Sonar Inspection
Sector: Waste Processing and Treatment • Location: Ontario, Canada
Source: Infrastructure Canada
Closed Circuit Television (CCTV) and sonar inspection of the western interceptor (Main/King CSO Tank (HWY 403) to Woodward Treatment Plant and Barton St. from Ferguson Ave. to Gage Ave.). Inspection is required for structural condition assessment and to determine volume of sediment inside the sewer. Inspection includes sewers ranging from 1200mm to 2550mm in diameter and extending approximately 12
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Western Interceptor Sewer CCTV and Sonar Inspection
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Closed Circuit Television (CCTV) and sonar inspection of the western interceptor (Main/King CSO Tank (HWY 403) to Woodward Treatment Plant and Barton St. from Ferguson Ave. to Gage Ave.). Inspection is required for structural condition assessment and to determine volume of sediment inside the sewer. Inspection includes sewers ranging from 1200mm to 2550mm in diameter and extending approximately 12 kilometers, affecting approximately 350,000 customers. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
