logo

Western Surat Gas Project

Sector: Government • Location: Australia

Source: Hydrocarbon Technology

Project
Closed

Western Surat Gas project involves the development of an area of coal seams covering 915km², located north of Roma, Queensland, Australia. Senex Energy owns and operates 100% of the project tenements. The initial appraisal wells of the project came online towards the end of 2016 under a pilot programme. The first phase of development activities commenced in October 2016, and Senex is currently mov

Project Information FAQ

Project Information

3 Q
The project “Western Surat Gas Project” is an infrastructure initiative in the Government sector, located in Australia. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Western Surat Gas project involves the development of an area of coal seams covering 915km², located north of Roma, Queensland, Australia. Senex Energy owns and operates 100% of the project tenements. The initial appraisal wells of the project came online towards the end of 2016 under a pilot programme. The first phase of development activities commenced in October 2016, and Senex is currently moving the project towards full-phase development. The Western Surat Gas project is located in the Maranoa and Western Downs Local Government Areas, and includes 13 blocks within the Authority to Prospect (ATP) 795, ATP 767 and part of ATP 889. Twelve of the total blocks are located 30km north-east of Roma, while the remaining block is located approximately 10km north of Wallumbilla. Western Surat gas project is estimated to contain net proven reserves of 8.3 million metric barrels of oil equivalent (Mmboe), and proven and probable reserves of 72.6Mmboe. Exploration and appraisal works have already been undertaken to better understand the reservoir properties and de-risk the project. The project will involve the drilling of up to 1,000 wells over a 30-year period, with a target gas production of up to 50 terajoules (TJ) a day. The proposed wells will mainly include production wells, with certain exploration and appraisal wells also planned. Each well will include a well pad covering an area of one hectare. The wells will be drilled to a depth between 150m and 800m, with the top sections being cased with steel and cement to prevent movement of water. Most of the wells will be vertical wells, while deviated wells are also planned to be drilled in certain areas. Power required for the drilling activities will initially be provided by diesel generators, which will be powered in later stages by gas. Senex commenced development of the project through the launch of a pilot programme at the Glenora block. The programme was completed in November 2016 and included appraisal of the pilot wells in the block. Rehabilitation works on 47 legacy wells on the Eos block were also undertaken. Senex announced the sanction of a $50m investment in a 30-well drilling programme in February 2017. The investment will also focus on the development of associate infrastructure, as well as the commencement of appraisal activities on the Eos block. The first wells from the programme are planned to come online in mid-2018, producing at the rate of 10TJ/day. The produced gas will be supplied to the Santos-operated Gladstone Liquefied Natural Gas (GLNG) plant, located on Curtis Island in Queensland. Plans for the construction of a gas production facility in the Eos Block and parallel appraisal wells west of the block have also been outlined. The next phase of development will include the drilling of additional 30-50 wells, subject to regulatory approvals. The activities will focus on optimising reservoir performance and maximising well recovery. The project is expected to require minimal compression and water handling facilities. Low-pressure gas from the wells will be transferred to three interconnected pods by gathering flowlines for initial compression. The compressed gas will then be transferred to a central processing facility for further compression and conversion into sales gas. A high-pressure steel pipeline will be built to transfer the sales gas to its destination. Senex has signed a 20-year gas sales agreement with GLNG, which includes the supply of 50TJ of gas a day to GLNG along with potential sharing of infrastructure facilities. GLNG will also purchase a small portion of the project acreage (Maisey block) for $42m.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data