Western Transmission Main Phase 2A
Sector: Water Supply and Storage • Location: O Fallon, Missouri, United States of America
Source: Dodge
The Contractor will be required to construct a water main extension along Highway D in Defiance, Missouri. The contractor will install approximately 3120 LF of 30 Ductile Iron water main, 530 LF of 30 Restrained Joint Ductile Iron water main, 540 LF of 36 HDPE water main, and related appurtenances along Highway D. This construction will include a connection to existing main on the eastern end and
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Government, Road, Waste Processing and Treatment, Commercial, Steel
- Location
- O Fallon, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Western Transmission Main Phase 2A
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Contractor will be required to construct a water main extension along Highway D in Defiance, Missouri. The contractor will install approximately 3120 LF of 30 Ductile Iron water main, 530 LF of 30 Restrained Joint Ductile Iron water main, 540 LF of 36 HDPE water main, and related appurtenances along Highway D. This construction will include a connection to existing main on the eastern end and a plug for future construction at the west end of the run. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | O Fallon |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Government, Road, Waste Processing and Treatment, Commercial, Steel |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
