Western Transmission Main Phase 4A
Sector: Water Supply and Storage • Location: O Fallon, Missouri, United States of America
Source: Dodge USA
The Scope of Work: The Project includes the installation of approximately 7,195 lf of 30 class 250 DIP non-restrained water main and 320 lf of 30 restrained DIP water main together with connections to existing 10 and 12 systems. The project includes the installation of twelve Fire Hydrant Assemblies and two Air Relief Valves.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Scope of Work: The Project includes the installation of approximately 7,195 lf of 30 class 250 DIP non-restrained water main and 320 lf of 30 restrained DIP water main together with connections to existing 10 and 12 systems. The project includes the installation of twelve Fire Hydrant Assemblies and two Air Relief Valves. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
