Westlock Waste-to-Energy Pilot Deployment
Sector: Waste Processing and Treatment • Location: Westlock, Alberta, Canada
Source: Stock Titan
Clean Energy Technologies, Inc. (CETY) has executed a non-binding Letter of Intent with Hoppy Power Ltd. to evaluate and advance deployment of CETY's proprietary High Temperature Ablative Pyrolysis (HTAP™) technology for waste-to-energy applications. The initial pilot site under evaluation is Westlock, Alberta, targeting a modular system capable of generating up to 2 MW of power per unit and proce
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Biomass, Power Generation (CCGT)
- Location
- Westlock, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Stock Titan
ConstructChat
Ask ConstructChat about Westlock Waste-to-Energy Pilot Deployment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Clean Energy Technologies, Inc. (CETY) has executed a non-binding Letter of Intent with Hoppy Power Ltd. to evaluate and advance deployment of CETY's proprietary High Temperature Ablative Pyrolysis (HTAP™) technology for waste-to-energy applications. The initial pilot site under evaluation is Westlock, Alberta, targeting a modular system capable of generating up to 2 MW of power per unit and processing up to 12,000 tons per year of biomass and waste-derived feedstock. The project aims for engineering validation, permitting progression, and execution beginning in late 2026, subject to definitive agreements and regulatory approvals. The deployment supports waste management and clean distributed energy generation with potential for scalable rollout across multiple sites. |
Original sector | Energy |
Location
Country | Canada |
State | Alberta |
City | Westlock |
Source
Source | Stock Titan |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Biomass, Power Generation (CCGT) |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
