logo
ProjectClosed

Westside HS Chilled Water System Modifications

One of 10,000+ projects Taiyo tracks in Nebraska.

Source: Dodge

Westside Community Schools wishes to modify the existing chilled water plant to improve the operating performance of the existing equipment. The chilled water plant to be converted from a variable primary pumping system to a variable primary/secondary system. Mechanical contractor to provide service to existing chillers and cooling tower systems as outlined in the construction documents. The Distr

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial
Location
Omaha, Nebraska, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Westside HS Chilled Water System Modifications

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Westside HS Chilled Water System Modifications” is an infrastructure initiative in the Water Supply and Storage sector, located in Omaha, Nebraska, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Westside Community Schools wishes to modify the existing chilled water plant to improve the operating performance of the existing equipment. The chilled water plant to be converted from a variable primary pumping system to a variable primary/secondary system. Mechanical contractor to provide service to existing chillers and cooling tower systems as outlined in the construction documents. The District will directly contract the controls work through Trane. The mechanical contractor shall coord...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Nebraska

City

Omaha

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial

Article published date

2025-01-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project