Westside Purple Line Extension, Section 1
Sector: Automotive • Location: California, United States of America
Source: Federal Highway Administration (FHWA)
The Purple Line Extension (formerly known as the Westside Subway Extension) is the extension of the Purple Line from its current terminus at Wilshire/Western nine miles to Los Angeles' "second downtown" through the neighborhoods of Beverly Hills, Century City, and Westwood. The new line will ultimately add seven stations upon the completion of all three sections of the project using the design-bui
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Purple Line Extension (formerly known as the Westside Subway Extension) is the extension of the Purple Line from its current terminus at Wilshire/Western nine miles to Los Angeles' "second downtown" through the neighborhoods of Beverly Hills, Century City, and Westwood. The new line will ultimately add seven stations upon the completion of all three sections of the project using the design-build delivery method: Section 1 is a 3.9-mile long segment along the Miracle Mile to Wilshire and La Cienega Boulevards (including three stations), Section 2 is 2.6 miles from La Cienega to Century City (including two stations), and Section 3 is a 2.9-mile section through Westwood to the VA Hospital. The extension will consist of twin tunnels approximately 20 feet wide, located 50-70 feet underground. The tunnels will be constructed using the cut and cover method. Section 1 stations will be located at Wilshire/La Brea, Wilshire Fairfax, and Wilshire/La Cienega. Section 1 also includes the procurement of 34 new heavy rail vehicles compatible with the existing system and improvements to existing Division 20 Rail Maintenance and Storage Yard to accommodate additional vehicles. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
