Westsyde Road Multi-Use Pathway
Sector: Residential • Location: British Columbia, Canada
Source: Infrastructure Canada
The proposed project is a 1.4 km multi-use pathway that will provide residents and visitors an accessible, separated, multi-use facility to walk, cycle, and roll safely between community destinations on I.R. #4. The multi-use pathway will be the first of its kind on I.R. #4. In addition to enhancing transportation options for residents, the pathway could also benefit economic development and touri
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in progress |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed project is a 1.4 km multi-use pathway that will provide residents and visitors an accessible, separated, multi-use facility to walk, cycle, and roll safely between community destinations on I.R. #4. The multi-use pathway will be the first of its kind on I.R. #4. In addition to enhancing transportation options for residents, the pathway could also benefit economic development and tourism by diversifying recreation options and creating connections to recreation and community amenities. The proposed project is the first phase of a larger 2 phased project. Phase 1 includes the construction of a 3-metre-wide multi-use gravel pathway on already developed land. Phase 1 of the project will create connections between the Band Office and key destinations in the community such as the Community Hall, rodeo grounds, moto cross track, camping area, scenic areas, and the future site of the proposed multi-purpose facility which includes a health facility and offices. I.R. #4 is bisected by Westsyde Road, a B.C. Ministry of Transportation and Infrastructure (MoTI) roadway, that has no designated pedestrian or bicycle facilities or lighting. Due to the lack of walking and biking infrastructure, community members are required to travel along the shoulder of the roadway to access community amenities and services. The posted speed limit on Westsyde Road is 80 km/h and the speed of traffic along roadway and lack of active transportation infrastructure has created pedestrian and cyclist safety concerns. The multi-use pathway is proposed on Band land and runs parallel to Westsyde Road. This pathway will help address safety concerns related to walking and cycling along Westsyde Road and encourage more active transportation use. Additionally, this project will create synergy with the conversations that the Band has had with the MoTI about improving pedestrian crossings and reducing vehicle speeds along Westsyde Road. Signage/pathway markers will also be installed at the path |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Residential projects in Canada
- Illusuak Cultural Centre
- University Of Calgary - Mackimmie Complex Civil And Landscape Redevelopment
- Lowe's Home Improvement Warehouses
- Manitoba Hydro High Voltage Test Facility
- Merit Contractors Association Tenant Improvement
- Coca-Cola Centre
- Leaside Village at 85 Laird Drive
- Humber College Building NX Deep Energy Retrofit
