Wet Well 3 Liner Replacement
One of 10,000+ projects Taiyo tracks in Wisconsin.
Source: Dodge USA
The project contemplated herein consists of the Contractor removing the existing liners, preparing the concrete surface, and installing the new liner for IPS Wet Well #3 in the Thickening Facility (Bldg. 256). The completed system shall provide a water- and gas-tight, corrosion-resistant lining that restores the walls and ceiling to original surface levels. The Contractor shall be responsible for
- Status
- Closed
- Sector
- Cement, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Milwaukee, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wet Well 3 Liner Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project contemplated herein consists of the Contractor removing the existing liners, preparing the concrete surface, and installing the new liner for IPS Wet Well #3 in the Thickening Facility (Bldg. 256). The completed system shall provide a water- and gas-tight, corrosion-resistant lining that restores the walls and ceiling to original surface levels. The Contractor shall be responsible for furnishing and installing scaffolding or other means within the wet wells necessary to perform th... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Milwaukee |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
