logo
ProjectClosed

Wet Well 3 Liner Replacement

One of 10,000+ projects Taiyo tracks in Wisconsin.

Source: Dodge USA

The project contemplated herein consists of the Contractor removing the existing liners, preparing the concrete surface, and installing the new liner for IPS Wet Well #3 in the Thickening Facility (Bldg. 256). The completed system shall provide a water- and gas-tight, corrosion-resistant lining that restores the walls and ceiling to original surface levels. The Contractor shall be responsible for

Status
Closed
Sector
Cement, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
Location
Milwaukee, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Wet Well 3 Liner Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wet Well 3 Liner Replacement” is an infrastructure initiative in the Cement sector, located in Milwaukee, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project contemplated herein consists of the Contractor removing the existing liners, preparing the concrete surface, and installing the new liner for IPS Wet Well #3 in the Thickening Facility (Bldg. 256). The completed system shall provide a water- and gas-tight, corrosion-resistant lining that restores the walls and ceiling to original surface levels. The Contractor shall be responsible for furnishing and installing scaffolding or other means within the wet wells necessary to perform th...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Milwaukee

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment

Article published date

2024-07-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project