logo
ProjectGc Bidding

Wet Well Mounted Sewage Pump Station

Gc bidding · Tennessee · Last reported Nov 2024

Source: Dodge USA

The Project consists of the following major elements: The project consists of the installation of a wet well mounted sewage pump station with wet well, piping, electrical and controls, backup generator and appurtenances; 8521 linear feet of 8, 10, 12, and 18 inch PVC and ductile iron gravity sewer; 3420 linear feet of 8 inch PVC and force main; casing pipe, stream crossings; site fencing, and asso

Status
Under Construction
Sector
Water Supply and Storage, Government, Commercial, Metal, Power Generation (CCGT), Waste Processing and Treatment, Steel
Location
La Vergne, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Wet Well Mounted Sewage Pump Station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wet Well Mounted Sewage Pump Station” is an infrastructure initiative in the Water Supply and Storage sector, located in La Vergne, Tennessee, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of the following major elements: The project consists of the installation of a wet well mounted sewage pump station with wet well, piping, electrical and controls, backup generator and appurtenances; 8521 linear feet of 8, 10, 12, and 18 inch PVC and ductile iron gravity sewer; 3420 linear feet of 8 inch PVC and force main; casing pipe, stream crossings; site fencing, and associated incidentals and appurtenances.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

La Vergne

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Metal, Power Generation (CCGT), Waste Processing and Treatment, Steel

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project