logo

WETLAND CREATION AT CEDAR POINT

Sector: Aerospace & Defense • Location: United States of America

Source: Grants.gov

Project
Archived

The Navy received authorization for Minor Nontidal Fills work at BPTF from the USACE on 22 June 2015. In accordance with the terms and conditions of MDSPGP-4 permit number 2014-61196, the Navy must meet compensatory wetland mitigation permit conditions for the impacts to wetlands associated with the BPTF Southern Drawl project. The Navy will fulfill the compensatory mitigation conditions by crea

Project Information FAQ

Project Information

4 Q
The project “WETLAND CREATION AT CEDAR POINT” is an infrastructure initiative in the Aerospace & Defense sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Navy received authorization for Minor Nontidal Fills work at BPTF from the USACE on 22 June 2015. In accordance with the terms and conditions of MDSPGP-4 permit number 2014-61196, the Navy must meet compensatory wetland mitigation permit conditions for the impacts to wetlands associated with the BPTF Southern Drawl project. The Navy will fulfill the compensatory mitigation conditions by creating wetlands to offset impacts on 0.31 acre (13,504 sf) of forested nontidal fill for the planned antenna footprint and 3.08 acres (134,165 sf) of forested nontidal wetland conversion to emergent nontidal wetland for the line-of-site clearance.Potential mitigation projects on the BPTF installation were discussed, but due to the presence of various constraints (including unexploded ordnance, protected species, archaeology, and base operations) at Blossom Point, creating wetlands on the installation would not be possible. With all of these things considered, mitigating offsite for the impacts associated with the Southern Drawl expansion project at BPTF is the only feasible option. To mitigate the impacts to wetlands at BPTF, the Navy entered into a Memorandum of Agreement (MOA) with Maryland Department of Natural Resources (MD DNR) to create wetlands on the Cedar Point Wildlife Management Area (WMA) in Charles County, Maryland. Cedar Point WMA is owned by the MD DNR and immediately adjacent to BPTF, therefore allowing for in-kind, off-site mitigation. The majority of the site has been farmland since before MD DNR acquired the property in 2009.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data