White Oak, Hebron Church, Ackerman Roundabout
Sector: Power Transmission • Location: Garner, North Carolina, United States of America
Source: Dodge USA
The proposed project is located at the intersection of White Oak Rd (SR2700, SR2547), Ackerman Rd (SR2709), Hebron Church Rd (SR2547). This project includes demo and reconstruction of the existing conditions to become a partial dual-lane roundabout. The project will include street and storm drainage improvements, raised concrete splitter islands, private utility relocation/coordination, pavement m
- Status
- Closed
- Sector
- Power Transmission, Cement, Road, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial, Power Generation (CCGT)
- Location
- Garner, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about White Oak, Hebron Church, Ackerman Roundabout
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project is located at the intersection of White Oak Rd (SR2700, SR2547), Ackerman Rd (SR2709), Hebron Church Rd (SR2547). This project includes demo and reconstruction of the existing conditions to become a partial dual-lane roundabout. The project will include street and storm drainage improvements, raised concrete splitter islands, private utility relocation/coordination, pavement markings, signal removal and traffic signage. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Garner |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Cement, Road, Waste Processing and Treatment, Water Supply and Storage, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
