White Oak Road Water Main Replacement - Phase 1
Sector: Water Supply and Storage • Location: Pierce Township, Ohio, United States of America
Source: Dodge USA
Work under this Project is generally defined as the construction of approximately 6,375 linear feet of 6", 8", 12", and 16" ductile iron water main to replace the existing 12" water mains along White Oak Road (between Behymer Road and Merwin Ten Mile Road) and along Merwin Ten Mile Road (between White Oak Road and Legend Oaks Drive), located in Pierce Township.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Metal, Government, Steel, Commercial
- Location
- Pierce Township, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about White Oak Road Water Main Replacement - Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work under this Project is generally defined as the construction of approximately 6,375 linear feet of 6", 8", 12", and 16" ductile iron water main to replace the existing 12" water mains along White Oak Road (between Behymer Road and Merwin Ten Mile Road) and along Merwin Ten Mile Road (between White Oak Road and Legend Oaks Drive), located in Pierce Township. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Pierce Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Metal, Government, Steel, Commercial |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
