White Pass Chair 4 Replacement
The owner, status and timeline of this project. A free account opens every field.
Source: SnowBrains
White Pass is replacing Chair 4 with a fixed-grip quad chairlift that primarily serves intermediate terrain at mid-mountain.
- Status
- Prospective
- Sector
- Built Sector
- Location
- White Pass, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- SnowBrains
ConstructChat
Ask ConstructChat about White Pass Chair 4 Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | White Pass is replacing Chair 4 with a fixed-grip quad chairlift that primarily serves intermediate terrain at mid-mountain. |
Original sector | Built Sector |
Location
Country | United States of America (USA) |
State | Washington |
City | White Pass |
Source
Source | SnowBrains |
URL |
More Details
Record type | Project |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
