Wholesale Markets Project
One of 10,000+ projects Taiyo tracks in Poland.
Source: World Bank Group
The First Wholesale Markets Project aims to construct a commercially self-sustaining urban wholesale market for the greater Gdansk area, complete with attendant physical infrastructure. There are two components. The first component 1) builds a fruit and vegetable hall complete with buyers' walkways and a provisions hall; 2) builds a flower hall with open stalls and storage rooms; 3) constructs an
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Government, Car parking, Residential, Automotive
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Wholesale Markets Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The First Wholesale Markets Project aims to construct a commercially self-sustaining urban wholesale market for the greater Gdansk area, complete with attendant physical infrastructure. There are two components. The first component 1) builds a fruit and vegetable hall complete with buyers' walkways and a provisions hall; 2) builds a flower hall with open stalls and storage rooms; 3) constructs an office building for use by the PHCRS (Gdansk wholesale market company) administration, maintenance, and security staff; 4) constructs ancillary buildings composed of a canopy covering the road, a toll booth, an office where entry fees will be collected and departure checks carried out, and a weighbridge with an inspection pit and customs control point; 5) groundwork and infrastructure including all heavy earth moving, creation of parking lots, construction of the road to the main highway, and fencing as well as installation of on-site water, sewage, electricity, gas, and telecommunications; and 6) pre-start-up expenses, working capital, and any fees and charges during construction. The second component 1) sets up a surface water drainage system that includes pipework to the existing culvert and a treatment plant to treat vehicle spillage and surface water; and 2) installs pipelines to connect the sewage system and the drinking water system, and connects the wholesale market to a gas supply line as well as interfacing with the public electricity and telecommunications networks. |
Original sector | FY17 - Industry, Trade and Services |
Budget |
Location
Country | Poland |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Government, Car parking, Residential, Automotive |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Poland
- Golice Wind Park
- Design and build of 18.2 km on the S19 highway between Dukla and Barwinek (Poland)
- Design and construction of 18.1 km of the S19 highway between Radzyn and Podlaski (Poland)
- Design and construction of the third section of the A2 over 12 km in the Mińsk Mazowiecki bypass (Poland)
- Cadbury Schweppes Confectionery Factory, Skarbimierz
- Design and construction of 17 km of S3 express road Swinoujscie-Tronszyn in the section between Swinoulscie-Dargobadz (Poland)
- Design and construction of 19.46 km of the S-61 highway between Prodborze and Sniadowo (Poland)
- Design and construction of 6,67 km of the S-7 highway between Plotnisko and Lesznowola (Poland)
