Wholesale Markets Project
Sector: Road • Location: Poland
Source: World Bank Group
The First Wholesale Markets Project aims to construct a commercially self-sustaining urban wholesale market for the greater Gdansk area, complete with attendant physical infrastructure. There are two components. The first component 1) builds a fruit and vegetable hall complete with buyers' walkways and a provisions hall; 2) builds a flower hall with open stalls and storage rooms; 3) constructs an
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The First Wholesale Markets Project aims to construct a commercially self-sustaining urban wholesale market for the greater Gdansk area, complete with attendant physical infrastructure. There are two components. The first component 1) builds a fruit and vegetable hall complete with buyers' walkways and a provisions hall; 2) builds a flower hall with open stalls and storage rooms; 3) constructs an office building for use by the PHCRS (Gdansk wholesale market company) administration, maintenance, and security staff; 4) constructs ancillary buildings composed of a canopy covering the road, a toll booth, an office where entry fees will be collected and departure checks carried out, and a weighbridge with an inspection pit and customs control point; 5) groundwork and infrastructure including all heavy earth moving, creation of parking lots, construction of the road to the main highway, and fencing as well as installation of on-site water, sewage, electricity, gas, and telecommunications; and 6) pre-start-up expenses, working capital, and any fees and charges during construction. The second component 1) sets up a surface water drainage system that includes pipework to the existing culvert and a treatment plant to treat vehicle spillage and surface water; and 2) installs pipelines to connect the sewage system and the drinking water system, and connects the wholesale market to a gas supply line as well as interfacing with the public electricity and telecommunications networks. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
