Whoop-Up Drive Bridge Recoating Project
Sector: Bridge • Location: Lethbridge, Alberta, Canada
Source: CTV News
Work on the Whoop-Up Drive Bridge recoating project is moving to a 24-hour schedule to help keep the project on schedule. A temporary noise bylaw exemption allows work to continue overnight from 11 p.m. to 7 a.m. The work on the bridge is anticipated to be completed by late September.
- Status
- Under Construction
- Sector
- Bridge
- Location
- Lethbridge, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- CTV News
ConstructChat
Ask ConstructChat about Whoop-Up Drive Bridge Recoating Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work on the Whoop-Up Drive Bridge recoating project is moving to a 24-hour schedule to help keep the project on schedule. A temporary noise bylaw exemption allows work to continue overnight from 11 p.m. to 7 a.m. The work on the bridge is anticipated to be completed by late September. |
Original sector | Built Sector |
Location
Country | Canada |
State | Alberta |
City | Lethbridge |
Source
Source | CTV News |
URL |
More Details
Record type | Project |
Sector | Bridge |
Article published date | 2026-07-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in Canada
- Reconstruction of the Île-aux-Tourtes Bridge that connects Montreal and the province of Ontario (Canada)
- Forrest Kerr Hydroelectric Project British Columbia
- Highway Rehab -- Bridge replacement Hallecks Rd., Lyn Rd., United Counties of Leeds and Grenville
- Highway Rehab -- Bridge rehabilitation Stewart Blvd. underpass, North Augusta Rd., underpass, Brockville
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Bridge rehabilitation, Culvert replacement 0.8 km west of Hwy 573 easterly to junction of Hwy 11, Englehart
- Highway Rehab -- Bridge rehabilitation, Resurfacing Hwy 427 to Kipling Ave., Hwy 401 west to Dixon Rd., Toronto
- Highway Rehab -- Bridge replacement Kasabonika Modular Bridge, Kasabonika Remote Northern Airport
- Highway Rehab -- Bridge replacement Grassy Lake Bridge, north of River Valley
