logo

Widen Turnpike from West Palm Beach Service Plaza to Southern Blvd

Prospective · Florida

Source: Florida Turnpike

Project
Prospective

The project widens the Floridas Turnpike Mainline SR 91 from the West Palm Beach Service Plaza to north of Southern Boulevard SR 80 US 98. The widening will increase the number of lanes from four to eight.Work includes pavement widening reconstruction milling and resurfacing bridge improvementsreplacements drainage improvements and noise walls in qualifying areas. Interchange improvements are pro

Status
Prospective
Sector
Bridge, Road, Manufacturing (Industrial), Waste Processing and Treatment
Location
Tallahassee, Florida, United States of America
Updated
22 Jul 2026
Source
Florida Turnpike

ConstructChat

Ask ConstructChat about Widen Turnpike from West Palm Beach Service Plaza to Southern Blvd

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Widen Turnpike from West Palm Beach Service Plaza to Southern Blvd” is an infrastructure initiative in the Bridge sector, located in Tallahassee, Florida, USA. Taiyo aggregates data on it from Florida Turnpike.

Participants

Not available for this record.

Status

Original status

prospective

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project widens the Floridas Turnpike Mainline SR 91 from the West Palm Beach Service Plaza to north of Southern Boulevard SR 80 US 98. The widening will increase the number of lanes from four to eight.Work includes pavement widening reconstruction milling and resurfacing bridge improvementsreplacements drainage improvements and noise walls in qualifying areas. Interchange improvements are proposed at the Southern Boulevard SR 80 US 98 interchange.Project Fact SheetProject Manager

Location

Country

United States of America (USA)

State

Florida

City

Tallahassee

Source

Source reliability

High

Source

Florida Turnpike

URL

More Details

Record type

Project

Sector

Bridge, Road, Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2023-08-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project