logo
ProjectProspective

Widen Western Beltway SR 429 PDE

Sector: Consumer Products • Location: Tallahassee, Florida, USA

Source: Florida Turnpike

Floridas Turnpike Enterprise FTE part of the Florida Department of Transportation FDOT is conducting a Project Development Environment PDE Study for widening the Western BeltwayState Road SR 429. The study limits extend along the Western Beltway from north of the I4SR 429 Interchange to Seidel Road in Orange and Osceola Counties Florida. As part of the study all interchanges within the project li

Status
Prospective
Sector
Consumer Products, Road, Manufacturing (Industrial)
Location
Tallahassee, Florida, United States of America
Updated
22 Jul 2026
Source
Florida Turnpike

ConstructChat

Ask ConstructChat about Widen Western Beltway SR 429 PDE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Widen Western Beltway SR 429 PDE” is an infrastructure initiative in the Consumer Products sector, located in Tallahassee, Florida, USA. Taiyo aggregates data on it from Florida Turnpike.

Participants

Not available for this record.

Status

Original status

prospective

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Floridas Turnpike Enterprise FTE part of the Florida Department of Transportation FDOT is conducting a Project Development Environment PDE Study for widening the Western BeltwayState Road SR 429. The study limits extend along the Western Beltway from north of the I4SR 429 Interchange to Seidel Road in Orange and Osceola Counties Florida. As part of the study all interchanges within the project limits and the need for a new interchange are being evaluated.A separate PDE Study is being conducted to evaluate the Poinciana Parkway Extension FPID No. 44658112201 a new roadway proposed to connect CR 532 to the I4SR 429 interchange in Osceola and Polk Counties. For more information on the Poinciana Parkway Extension PDE Study please visit www.PoincianaExtension.com.The PDE study is the second phase of the FDOT project development process. Each PDE study requires the combined efforts of professional engineers planners and scientists to collect data develop and evaluate alternatives conduct studies prepare reports and gather input from the general public applicable agencies and interested parties. The goal of the PDE process is to develop the best solution which meets the transportation needs and offers the greatest benefit with the least impact.Click here to see the PDE Process video

Location

Country

United States of America (USA)

State

Florida

City

Tallahassee

Source

Source reliability

High

Source

Florida Turnpike

URL

More Details

Record type

Project

Sector

Consumer Products, Road, Manufacturing (Industrial)

Article published date

2023-08-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project