WI/DOT: Construct Hangar 9-Unit T-Hangar
Sector: Power Generation (CCGT) • Location: Oshkosh, Wisconsin, United States of America
Source: Dodge
The Work under this contract consists of the construction of a new 9-Unit T-Hangar building, associated concrete foundations, site work, electrical, mechanical, and new/updated taxilanes and aprons, and all incidental items necessary to complete the Work as shown on the plans and included in the Proposal and Contract. Base Bid: Construction of a 9-unit T-hangar building and Taxilanes NS1 and NS2 a
- Status
- Closed
- Sector
- Power Generation (CCGT), Road, Aerospace & Defense, Manufacturing (Industrial), Cement, Commercial
- Location
- Oshkosh, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WI/DOT: Construct Hangar 9-Unit T-Hangar
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work under this contract consists of the construction of a new 9-Unit T-Hangar building, associated concrete foundations, site work, electrical, mechanical, and new/updated taxilanes and aprons, and all incidental items necessary to complete the Work as shown on the plans and included in the Proposal and Contract. Base Bid: Construction of a 9-unit T-hangar building and Taxilanes NS1 and NS2 and service roads, and reconstruction of Taxiway J, including two existing hangar removals, site c... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Oshkosh |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Aerospace & Defense, Manufacturing (Industrial), Cement, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
