WI/DOT: Hartling Road Structure Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
T Merton, Hartling Rd, Bark River Bridge B67-0210, CTH EF Waukesha County Removals, Milling, Grading, Aggregate, Asphalt Pavement, Structure Rehabilitation, Beam Guard, Erosion Control, Permanent Signing, Traffic Control, Pavement Marking, Restoration.
- Status
- Closed
- Sector
- Commercial, Bridge, Road, Manufacturing (Industrial)
- Location
- Merton, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WI/DOT: Hartling Road Structure Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | T Merton, Hartling Rd, Bark River Bridge B67-0210, CTH EF Waukesha County Removals, Milling, Grading, Aggregate, Asphalt Pavement, Structure Rehabilitation, Beam Guard, Erosion Control, Permanent Signing, Traffic Control, Pavement Marking, Restoration. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Merton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Road, Manufacturing (Industrial) |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
